| OWNER OR CONTRACTOR MOWING | ENFORCEMENT MOWING |
| CYCLE 1 -- March 26 to April 3 | April 4 |
| CYCLE 2 -- April 30 to May 8 | May 9 |
| CYCLE 3 -- June 4 to June 12 | June 13 |
| CYCLE 4 -- July 9 to July 17 | July 18 |
| CYCLE 5 -- August 13 to August 21 | August 22 |
| CYCLE 6 -- September 17 to September 25 | September 26 |
| CYCLE 7 -- October 22 to October 30 | October 31 |
| CYCLE 8 -- November 26 to December 4 | December 5 |
Mowing Specifications
- Eight (8) cycles of mowing according to the schedule established by The Las Colinas Association. Adjoining public rights-of-way must be included.
- Mowing height is not to exceed a maximum of six (6) inches.
- Trimming must be provided around all items a minimum of twenty (20) feet back of street curbs and property lines adjacent to developed sites. TU Electric equipment further than twenty (20) feet away from the curb must be trimmed around.
- Curbs must be edged -- grass and dirt must be swept/blown out of the street. Limbs, litter, and debris must be removed from the property.
- Only those portions of field tracts containing active growth of spring wildflowers may remain unmowed. The owner should notify the Association of their intentions to avoid enforced mowing.
Program Operation
The Las Colinas Association administers the annual field mowing program and defines adequate mowing maintenance of undeveloped lots and field condition expansion areas as adherence to the above specifications.
If mowing, trimming, and curb maintenance are not provided prior to each enforcement date, the Association will hire a contractor to perform the needed work, at the owner’s expense. (Ref.: Article VI, Las Colinas Declaration).
|
|
|